All articles

KajoData / Career & business

Becoming a better data analyst: cooperation, quality and scope

An order report shows where technical skills meet conversations about definitions, deadlines, feedback and responsibility for the next step.

Kajo RudzińskiPublished Updated 13 min read

A bridge and cables connect islands holding a database, chart and compass.

You want to become a better data analyst, so you add another SQL course to your plan. I understand the impulse. A technical task has an appealing property: you can usually see whether the query ran. It is harder to notice that you correctly calculated the wrong thing. Or that the reader understands a metric differently from you. Those are the situations where I start talking about cooperation, communication and the boundaries of a task.

I do not assign a universal percentage of analytical success to technical skills and another percentage to communication. I have no evidence for such a split. I prefer to find the specific point where work gets stuck. Can you join the tables? Can anyone agree on what a customer means? Is the report complete while nobody knows who should respond? Each problem calls for a different kind of practice, and another course will not automatically address all three.

Start with a situation where the result helps someone act

Consider a synthetic example. An order support team asks for a report on delays. They want to decide which cases to discuss at their morning meeting. One person means orders that have not been dispatched on time. Another means parcels that have not reached customers. A third means every open support ticket. They share a report name, but describe three different processes. Choosing an attractive visualization cannot resolve that disagreement on its own.

I ask about the last specific occasion: what did the reader need to check, what information was missing and what could they have done with it? I ask them to walk through one case. This might reveal that an order owner and a promised dispatch date matter more than another seasonal chart. I write down the question and the expected action. That becomes my reference point when requests for additional features arrive during development.

Microsoft’s BI solution planning guidance recommends involving the appropriate users in gathering requirements and distinguishes business design from technical design. In this small example, I turn that into a short conversation about intended use, followed by checking whether the available fields support it. An elaborate workshop is unnecessary for every spreadsheet. A shared understanding of the task remains useful even when the spreadsheet is small and the first deadline is close.

Agree on the definition before calculating

In this example, we define a late order as one that has not been fully dispatched by the end of its promised dispatch day. The report describes the state at a named moment. We exclude cancellations while showing their count separately. An order may contain several parcels, so we also decide whether dispatching the first parcel closes the case. Here, the complete order must leave. I record these choices in the user’s language before translating them into technical rules.

I ask the reader for three cases: definitely late, definitely on time and uncertain. The uncertain case is often the most useful. It reveals a boundary that a general sentence hides. If someone changed the promised date after the order was placed, we need to decide which date to use. I do not settle that quietly inside the calculation. The choice affects how the process is assessed, so it belongs in a conversation with the person responsible for that process.

I also state what the result does not cover. This project does not measure delivery quality or customer satisfaction. An order dispatched on time may arrive late. A customer may be unhappy even when the promise was met. An explicit boundary prevents me from telling a story about something I have not measured. It also improves the presentation: I use a precise metric name from the start instead of hiding several exceptions in a tiny footnote beneath the final chart.

Check quality with someone who understands the process

I find two rows with the same order identifier. I could delete one automatically and enjoy the satisfaction of cleaning data. First, however, I ask what a row represents. Perhaps the rows describe separate parcels. Perhaps they are events in a status history. Only that answer lets me distinguish a duplicate from legitimate detail. Knowing which spreadsheet command removes duplicates cannot supply the missing business meaning, however quickly I can apply that command to the entire column.

A complete column can still contain incorrect dates. A valid date format does not prove that an event actually happened at that time.

The Government Data Quality Framework distinguishes completeness, uniqueness, consistency, timeliness, validity and accuracy. I use those distinctions as prompts for checking fitness for purpose, combining inspection of the table with questions about how the records were created. A successful import is only the beginning of that assessment. It does not establish that the data supports the particular decision the reader hopes to make with the report.

I avoid the vague question, “Is this data good?” Instead, I provide an identifier, a field, its expected meaning and the observed difference. For example, order A has a dispatch date earlier than its creation date. I ask whether this reflects migration, correction or an error. A specific question makes a specific answer possible. It also avoids asking a colleague to defend an entire system they may simply have inherited from someone else.

Report the problem without looking for someone to blame

A useful error report explains its effect on the result. Suppose two orders in a synthetic sample of ten lack a promised date. I do not quietly classify them as on time. I state that eight orders can be classified and two need clarification. The reader can immediately see that the metric does not describe the complete sample. They can decide whether to fill in the missing information before the meeting or work with a separate list of uncertain cases.

I separate observations from explanations. “Two promised dates are missing from the export” is an observation. “The field was not completed when the order was created” is a hypothesis. That hypothesis may be wrong because the export itself could have dropped the values. In a conversation with a technical team, this distinction reduces unnecessary accusations. It also provides a concrete next step: compare those two identifiers with their records in the source system before changing the reporting logic.

Rather than asking someone to “fix the data,” I propose an owner for the investigation and a date for an answer. If nobody has been assigned, I make that dependency visible. I cannot take responsibility for repairing a system without the relevant access or operational knowledge. I can describe the problem clearly, explain its impact and ensure that it remains visible after the first version of the report has been published and the immediate excitement has passed.

Data passes through a checkpoint and branches towards agreed destinations.

Reduce scope while protecting the main result

Report requests often grow as work progresses. First comes a list of delayed orders, then a warehouse comparison, a forecast and a supplier assessment. Each suggestion may be sensible. The difficulty appears when all of them inherit the deadline agreed for the original list. I show the scope of version one, the additional proposals and their dependencies. The person responsible for priorities can then decide what is actually needed for the next meeting and what can wait.

I do not promise that twenty percent of the effort always produces eighty percent of the outcome. The Pareto principle can serve as a metaphor for prioritization, but a numerical split requires evidence in the particular setting. My practical question is simpler: what is the smallest scope that supports the agreed action? I can postpone another tab. I cannot postpone checking whether the main metric has counted parcels when it was supposed to count complete orders.

If I need clarification about dispatch dates, I say so before the end of the day. I explain two options: a list of eight classified cases tomorrow with missing values shown explicitly, or a complete result later after clarification. I do not choose silently when the options have different consequences for the meeting. This is how I approach assertiveness: name the constraint and help someone make a decision, instead of accepting every request and hoping the problem disappears overnight.

Show a draft and ask for specific feedback

The first draft can be extremely simple. A few synthetic rows, proposed column names and a place for the refresh timestamp may be enough. I ask the reader to identify a case worth discussing and the person responsible for the next action. If every column requires my explanation, the draft has revealed a problem worth fixing before I build the complete solution. This is a good moment to change a label, remove an unnecessary field or reorder the information.

Instead of asking whether people like it, I ask what information is missing for them to choose an order for follow-up. Questions about appearance tend to produce comments about colors. Questions about use direct attention towards the action the report should support. When someone suggests another metric, I ask for an example of a decision it would change. Every suggestion deserves an answer, even if it will not be included in the first release, so its author knows what happened to it.

I turn feedback into an intended behavior: we add the promised date because the reader needs to understand how long the delay is. “The report is unclear” does not yet identify the required change. If two people disagree, I return to the agreed use. Perhaps they need different views. Perhaps one suggestion belongs to another task entirely. A vote on the most attractive chart cannot settle a disagreement about which question the report is meant to answer.

Hand over a result someone else can take responsibility for

Before delivery, I follow one order from its source record to its reported status. I explain the reading time, classification rule and missing fields. The reader does not need to understand all the code to understand the basis of the result. If I cannot explain it plainly, I check whether my own assumptions are organized. A short handover becomes a useful examination of my reasoning, as well as an instruction for the person who will use the file.

I establish who refreshes the data and who receives reports of problems. A report without an owner quickly becomes dependent on one person’s memory. I also hand over the known limitation: two orders without promised dates remain outside the classification, with a way to find them. “The data may contain errors” is insufficient. That sentence does not help anyone decide whether a specific result is suitable for a specific discussion or whether an investigation must happen first.

In the final message, I distinguish a finding from a recommendation. “Three of the eight classified cases exceeded the promised date” describes the synthetic result. “Let us check these with the warehouse owner first” proposes an action. “The warehouse is understaffed” would explain a cause that the list alone cannot establish. Better communication gives me less reason to use confident language to cover such a gap. I can be precise about the finding while remaining open about its explanation.

Stay in contact with the people using the result

After publication, I ask the reader about the last time they used the report. I ask them to show the moment when they checked something. This can reveal that the list works at the morning meeting but lacks an afternoon update or a changed case owner. I record the problem, its frequency and its effect before promising a new version. Then I compare it with other requests and the time available to address them.

That contact also reveals process changes. If the team now splits orders differently, the definition may need another discussion. I therefore name someone responsible for the meaning of the metric, alongside the person maintaining the file. When that person changes roles, the handover should cover exceptions and earlier choices. A list of refresh steps cannot explain why we originally chose one date over another. Those choices need to remain understandable to the next person.

Building relationships does not require being permanently available. I agree where requests belong and roughly when I review them. A short conversation can resolve ambiguity, but I record decisions affecting definitions with the task. A colleague who missed the conversation can then understand the change. Nobody should have to reconstruct the reporting rules from private messages or guess which of several spreadsheet versions the user finally accepted.

Choose a conversation that fits the problem

For one missing date, I send a specific example and the answer I need. When three people understand delay differently, I suggest a short discussion around one disputed case. I want a definition and an owner who can confirm it, rather than another collection of broad ideas. Sending the example beforehand lets participants inspect their systems instead of answering from memory while everyone waits on the call.

Afterwards, I state the agreement, the open question and the next action. If nobody decided, I say the definition remains unresolved. Silence after a message does not automatically establish acceptance. A small report may need only a brief confirmation from its process owner; a larger solution follows the organization’s approval practice. What matters is knowing which rule applies and when comparisons between periods can start using it.

Protect time for work that needs concentration

Conversations need time, and checking the result needs time too. If every question interrupts a calculation review, I can lose the context and miss a condition. I group small questions and explain when I will respond. I judge urgency by the consequence and the decision deadline. An exclamation mark alone does not explain why I should abandon a metric check needed for a meeting in an hour.

If two people need work at the same time, I show the conflict to whoever sets priorities. I explain both outcomes and the effect of postponing each. I do not promise two full working days inside one calendar day. That commitment looks friendly only until the first missed deadline. I prefer agreeing on an achievable order early, then delivering the chosen scope with the checks needed to understand and trust its basis.

Take a small completed piece of work and describe it without naming tools. Who needed what? What did one row represent? Which definition required a conversation? What uncertainty did you communicate? Where did you record the owner of the next step? If you have no professional project, use a fictional report containing ten orders. Another person can play the user and ask where a number came from. You do not need company data to practice explaining the reasoning.

Choose one thing to improve in your next analysis. You might write the definition before calculating or show a draft before building the dashboard. After delivery, check whether the change addressed the problem you identified. Do not assess cooperation only by counting meetings or compliments. I prefer evidence that the reader understands the result, can name its boundaries and knows what to do next. That evidence is also easier to discuss with a colleague than a broad claim that your communication has improved.

If the difficulty lies in organizing the task itself, continue with planning an analytical project. For the wider relationship between technical work and professional value, see technical skills and cooperation. Both kinds of skill can be practiced in the same project. A conversation about data belongs inside analytical work, alongside the query, the table and the final explanation.

Key takeaways

Can communication skills replace SQL and Excel knowledge?

No. They help establish what to calculate and how to use the result. Correct calculations still require technical skills.

Does the Pareto principle justify skipping data checks?

No. I treat it at most as a reminder to reduce scope. Checks that protect the main metric still belong in the first version.

How do I explain that a report cannot be ready tomorrow?

Name the dependency, offer a smaller useful scope and ask the person responsible for priorities to choose between scope and timing.

AI was used in an automated way while working on this article. If you want to learn how to do it too, check out this project.

Kajo Rudziński

Newsletter KajoData

Let’s keep in touch.

I write about data analysis, learning and changing careers. My newsletter and the sign-up form are in Polish. If that works for you, I’d be glad to see you there.